Pulaski County Commercial Building & Structural Permit Calculator
Official fee schedule logic based on Little Rock City Code Sec 8-22. Includes plan review fees, technology surcharges, and prerequisite contractor bond rules.
- AHJ Authority
- City of Little Rock Planning & Development
- Enforced Ordinance
- Little Rock City Code Sec 8-22
- Plan Check SLA
- 10 - 15 Business Days
- Surety Bond Required
- $10,000
Pulaski County Commercial Permit Fee Estimator
Tier Valuation Formula: $1,665 base fee + $3.80 per $1,000 above $250,000 valuation.
Mandatory Contractor Prerequisites & Submittal Checklist
Pulaski County AHJ RequirementsContractor Surety License Bond
Pulaski County requires an active $10,000 Arkansas Commercial License Bond on file prior to plan submittal.
Commercial COI Liability ($1M+)
Minimum $1.0M General Liability COI naming Pulaski County Building Dept as Certificate Holder.
Commercial Building & Structural Submittal Rules in Pulaski County
Specialized trade submittals for Commercial Building & Structural in Pulaski County, Arkansas are administered by City of Little Rock Planning & Development. Permits are required prior to installing, extending, replacing, or altering any mechanical, electrical, plumbing, structural, or life-safety infrastructure under Little Rock City Code Sec 8-22.
Intake review for Commercial Building & Structural requires verified trade licensing, minimum contractor general liability COI filings ($1,000,000+), and compliance with enforced regional code editions (2021 Arkansas Fire Prevention Code compliance.).
Mandatory Submittal Plan Documents & PE Engineering Stamps
Plans submitted to City of Little Rock Planning & Development for Commercial Building & Structural must include scaled engineering drawings and specifications:
- Commercial Site Plan
Inspection Sequence for Commercial Building & Structural
Work performed under a Commercial Building & Structural permit in Pulaski County requires mandatory rough-in and final field inspections. Rough-in inspections must be conducted and signed off by the municipal inspector prior to covering or concealing any piping, ductwork, structural framing, or electrical conductors. Final inspection and system testing are required for building certificate of completion issuance.
City of Little Rock Planning & Development Official Building Department