Denver County Commercial Mechanical & HVAC Systems Permit Calculator

Official fee schedule logic based on Denver Building Code Policy 130. Includes plan review fees, technology surcharges, and prerequisite contractor bond rules.

Direct Answer Engine Specifications (Commercial Mechanical & HVAC Systems) Verifiable Municipal Factsheet
AHJ Authority
Denver Community Planning and Development
Enforced Ordinance
Denver Building Code Policy 130
Plan Check SLA
12 - 18 Business Days
Surety Bond Required
$10,000
AHJ Verified Workstation 2026 Fee Schedule Enforced

Denver County Commercial Permit Fee Estimator

$
Quick Presets:
📐 Applied Municipal Formula Tier 📜 Denver Building Code Policy 130

Tier Valuation Formula: $1,665 base fee + $3.80 per $1,000 above $250,000 valuation.

3. Itemized Cost Assessment AHJ Verified
Base Municipal Permit Fee: $0.00
Plan Review Fee (65%): $0.00
Tech & Admin Surcharge (4%): $0.00
Fee Ratio Breakdown: Base 58% | Review 38% | Tech 4%
Estimated Total Permit Fee All Municipal AHJ Surcharges & Ordinance Fees Included
$0.00

Mandatory Contractor Prerequisites & Submittal Checklist

Denver County AHJ Requirements
Permit Prerequisite Sponsored Partner ↗

Contractor Surety License Bond

Denver County requires an active $10,000 Denver Contractor License Bond on file prior to plan submittal.

Get $10,000 Bond Quote →
Insurance Mandate Sponsored Partner ↗

Commercial COI Liability ($1M+)

Minimum $1.0M General Liability COI naming Denver County Building Dept as Certificate Holder.

Generate COI Certificate →
📋
Commercial Mechanical & HVAC Systems Submittal Guide — Denver County Enforced under Denver Building Code Policy 130 | Reviewed Q3 2026
PE Stamp Required

Commercial Mechanical & HVAC Systems Submittal Rules in Denver County

Specialized trade submittals for Commercial Mechanical & HVAC Systems in Denver County, Colorado are administered by Denver Community Planning and Development. Permits are required prior to installing, extending, replacing, or altering any mechanical, electrical, plumbing, structural, or life-safety infrastructure under Denver Building Code Policy 130.

Intake review for Commercial Mechanical & HVAC Systems requires verified trade licensing, minimum contractor general liability COI filings ($1,000,000+), and compliance with enforced regional code editions (Denver Green Building Ordinance and snow-load engineering requirements.).

Mandatory Submittal Plan Documents & PE Engineering Stamps

Plans submitted to Denver Community Planning and Development for Commercial Mechanical & HVAC Systems must include scaled engineering drawings and specifications:

Required Documents
  • MEP Mechanical Load Calculations
  • COMcheck Energy Compliance Form
Base Fee Structure Minimum permit fee: $195 | Plan review surcharge: 40% of base fee.

Inspection Sequence for Commercial Mechanical & HVAC Systems

Work performed under a Commercial Mechanical & HVAC Systems permit in Denver County requires mandatory rough-in and final field inspections. Rough-in inspections must be conducted and signed off by the municipal inspector prior to covering or concealing any piping, ductwork, structural framing, or electrical conductors. Final inspection and system testing are required for building certificate of completion issuance.

Official AHJ Source Citation

Denver Community Planning and Development Official Building Department

200 W 14th Ave, Denver, CO 80204 | Phone: (720) 865-2700