Multnomah County (Portland) Commercial Building & Structural Permit Calculator
Official fee schedule logic based on Portland City Code Title 24. Includes plan review fees, technology surcharges, and prerequisite contractor bond rules.
- AHJ Authority
- City of Portland Bureau of Development Services (BDS)
- Enforced Ordinance
- Portland City Code Title 24
- Plan Check SLA
- 14 - 22 Business Days
- Surety Bond Required
- $20,000
Multnomah County (Portland) Commercial Permit Fee Estimator
Tier Valuation Formula: $1,665 base fee + $3.80 per $1,000 above $250,000 valuation.
Mandatory Contractor Prerequisites & Submittal Checklist
Multnomah County (Portland) AHJ RequirementsContractor Surety License Bond
Multnomah County (Portland) requires an active $20,000 Oregon CCB Contractor Bond on file prior to plan submittal.
Commercial COI Liability ($1M+)
Minimum $1.0M General Liability COI naming Multnomah County (Portland) Building Dept as Certificate Holder.
Commercial Building & Structural Submittal Rules in Multnomah County (Portland)
Specialized trade submittals for Commercial Building & Structural in Multnomah County (Portland), Oregon are administered by City of Portland Bureau of Development Services (BDS). Permits are required prior to installing, extending, replacing, or altering any mechanical, electrical, plumbing, structural, or life-safety infrastructure under Portland City Code Title 24.
Intake review for Commercial Building & Structural requires verified trade licensing, minimum contractor general liability COI filings ($1,000,000+), and compliance with enforced regional code editions (2022 Oregon Structural Specialty Code (OSSC).).
Mandatory Submittal Plan Documents & PE Engineering Stamps
Plans submitted to City of Portland Bureau of Development Services (BDS) for Commercial Building & Structural must include scaled engineering drawings and specifications:
- Oregon CCB License Verification
Inspection Sequence for Commercial Building & Structural
Work performed under a Commercial Building & Structural permit in Multnomah County (Portland) requires mandatory rough-in and final field inspections. Rough-in inspections must be conducted and signed off by the municipal inspector prior to covering or concealing any piping, ductwork, structural framing, or electrical conductors. Final inspection and system testing are required for building certificate of completion issuance.
City of Portland Bureau of Development Services (BDS) Official Building Department
1900 SW 4th Ave, Portland, OR 97201 | Phone: (503) 823-7300