Salt Lake County Commercial Plumbing Systems Permit Calculator
Official fee schedule logic based on Salt Lake City Code Title 18. Includes plan review fees, technology surcharges, and prerequisite contractor bond rules.
- AHJ Authority
- Salt Lake City Building Services Division
- Enforced Ordinance
- Salt Lake City Code Title 18
- Plan Check SLA
- 10 - 15 Business Days
- Surety Bond Required
- $15,000
Salt Lake County Commercial Permit Fee Estimator
Tier Valuation Formula: $1,665 base fee + $3.80 per $1,000 above $250,000 valuation.
Mandatory Contractor Prerequisites & Submittal Checklist
Salt Lake County AHJ RequirementsContractor Surety License Bond
Salt Lake County requires an active $15,000 Utah DOPL Contractor Bond on file prior to plan submittal.
Commercial COI Liability ($1M+)
Minimum $1.0M General Liability COI naming Salt Lake County Building Dept as Certificate Holder.
Commercial Plumbing Systems Submittal Rules in Salt Lake County
Specialized trade submittals for Commercial Plumbing Systems in Salt Lake County, Utah are administered by Salt Lake City Building Services Division. Permits are required prior to installing, extending, replacing, or altering any mechanical, electrical, plumbing, structural, or life-safety infrastructure under Salt Lake City Code Title 18.
Intake review for Commercial Plumbing Systems requires verified trade licensing, minimum contractor general liability COI filings ($1,000,000+), and compliance with enforced regional code editions (2021 Utah State Building Code & seismic design category D.).
Mandatory Submittal Plan Documents & PE Engineering Stamps
Plans submitted to Salt Lake City Building Services Division for Commercial Plumbing Systems must include scaled engineering drawings and specifications:
- Plumbing Isometric Schematics
- Backflow Prevention Certificate
Inspection Sequence for Commercial Plumbing Systems
Work performed under a Commercial Plumbing Systems permit in Salt Lake County requires mandatory rough-in and final field inspections. Rough-in inspections must be conducted and signed off by the municipal inspector prior to covering or concealing any piping, ductwork, structural framing, or electrical conductors. Final inspection and system testing are required for building certificate of completion issuance.
Salt Lake City Building Services Division Official Building Department
451 S State St, Salt Lake City, UT 84111 | Phone: (801) 535-6000